Skip to content
SMITH CLIMATE SOLUTIONS LLC
NEW CONSTRUCTION / ROUGH-IN

New Construction HVAC in Northeast Mississippi

Building new? We rough in the ductwork and set the air handler before insulation and drywall, then come back and set the equipment. No shortcuts, no sloppy ductwork.

Need a repair instead? Request Service

What you get

New Construction

01

Rough-in

Ductwork run and the air handler set, ready for insulation and drywall.

02

Layout and airflow

Proper layout and airflow design from the start, with clean installs.

03

Package heat pumps

A 5-ton package heat pump on a new house, ducted through the brick foundation.

04

Split systems

Attic air handlers with duct runs branching to each room.

05

Light commercial new builds

A 4-ton Ruud system with exposed spiral ductwork in a new fellowship hall.

The details

The numbers people ask about first.

Size Your System
Stage one
Rough-inDuctwork run and air handler set before insulation and drywall.
Stage two
Equipment setOutdoor unit or package unit on its pad, connected and started.
Recent new builds
5-ton package heat pump, 4-ton splitA house and a fellowship hall.
Equipment we install
RuudAs shown in our project photos.
Estimate
FreeCall or message (662) 660-3380.

These describe our own recent jobs. Your plans set the layout and the equipment.

Done right. Left clean.

Quality workmanship now means fewer problems later

A rough-in gets covered by insulation and drywall, so it has to be right before anyone closes the walls. We take pride in doing it right the first time, and it always feels good seeing a project take shape from the ground up. We are thankful for the builders and homeowners who continue to trust us with their projects.

How we work
Plan for this

Call before framing is closed

HVAC rough-in happens after framing and before insulation and drywall. Bring us in early enough to plan the runs.

Decide where the equipment sits

Attic air handler, crawlspace, or a package unit outside. It affects the framing and the foundation penetrations.

Plan the pad and the power

The outdoor unit needs a pad location, a disconnect and a clear path for the lines.

How a job runs

How a job runs.

  1. 01

    Call

    Call or message (662) 660-3380. A local company answers the phone.

  2. 02

    Look

    We look at the equipment, the ductwork and the electrical, and tell you when a repair makes more sense than a replacement.

  3. 03

    Estimate

    Free estimate on new systems.

  4. 04

    Install or repair

    A new pad or wall mount where it is needed, sealed duct connections, and a new disconnect and surge protector on installs.

  5. 05

    Finish

    Line sets covered, penetrations sealed, the site left clean.

FAQ

Questions we get.

When does HVAC go in on a new house?

In two stages. The rough-in, with ductwork run and the air handler set, happens after framing and before insulation and drywall. The equipment is set and started near the end of the build.

Do you work with builders?

Yes. We do rough-ins and equipment sets for builders and for homeowners building their own house.

Can you put a package unit on a new house?

Yes. One of our projects is a 5-ton package heat pump on a new construction home, ducted through the foundation.

Do you do new commercial buildings?

Yes. We installed a 4-ton Ruud system with exposed spiral ductwork in a new fellowship hall.

What areas do you cover?

Tishomingo, Itawamba, Prentiss, Lee and Alcorn counties in Northeast Mississippi.

Service area

Tishomingo Co. · Itawamba Co. · Prentiss Co. · Lee Co. · Alcorn Co. · Hardin Co. TN · McNairy Co. TN

Done right. Left clean.

Tell us about the job.

Send the basics and we will follow up.

Something broken now? Request Service

Authorized Ruud dealer
No heat or no AC? Get help now
Call Service quote